Site study
- Designs
- 1
- Revisions
- 1
- Revision window
- 7 days
Floor plans and front elevation DXF
and a preliminary review table
KHAIT residential design studio
Confirm your site dimensions and tell us what you want to build. Get editable DXF plans, a front elevation and a preliminary setback, coverage and parking review.
These are preliminary designs. Construction requires review by an accredited engineering office against the Saudi Building Code and a building permit.

The process
Choose a deed, survey or CAD drawing and preview it after signing in.
Check the boundary, frontage, setbacks, site coverage and parking requirement.
Set floors, apartments, bedrooms and ground-floor use, then choose a package.
After payment, download DXF plans, a street elevation and the preliminary review.
KHAIT portfolio
Pricing in Saudi riyals
Proposed VAT-inclusive prices. Checkout opens after pricing approval and merchant activation.
Floor plans and front elevation DXF
and a preliminary review table
Floor plans and front elevation DXF
and a preliminary review table
Floor plans and front elevation DXF
and a preliminary review table
Delivery Automated generation after payment and dimension confirmation, usually within minutes. The revision window starts when payment is verified.
Outside the packages Municipal approval, engineer’s seal, a building permit, structural, electrical and mechanical design.
Delivery formats Available now: DXF. Native Revit (RVT) and AutoCAD (DWG) files will launch once the Autodesk connection is complete and tested.
Use a PDF or image for a title deed or survey, DXF or DWG for CAD, or a GeoJSON parcel boundary. The file limit is 16 MiB. Mask names, IDs and verification codes.
Editable DXF floor plans, a front elevation and a preliminary coverage, setback and parking review. Native RVT and DWG are planned after Autodesk activation.
Open a saved project, edit the program or describe a revision, confirm the fields and use a revision from your package.
Automated files usually take minutes after payment and confirmation. Revision windows vary by package, from 7 to 30 days.
Ask for withdrawal before benefiting from the service under applicable law, or contact us about late delivery or a defective file. See the refund policy.
Your files belong to your account. Access to source documents expires after 24 hours and download links after five minutes. You can delete your project earlier.
An accredited engineering office must check site-specific requirements and the Saudi Building Code and prepare the formal design and permit application.